Alumina Refinery Water Cooling Tower


Client: ALCAN Engineering
Project Manager: ALCAN Engineering
Location: Gove, Northern Territory 

  • The 40mx11m four-cell tower was designed and fully shop detailed by Bligh Tanner for prefabrication of all elements above the substructure.
  • All panels, including the 11m high inter-cell panels, were cast on site and lifted into place using existing cranes.
  • Full cell width access doors meet the operation and maintenance requirements of the tower.
  • Close attention to sealant selection and connection detailing deal with the very high water temperatures in the tower.
  • Constructed on a stiffened ground raft to allow for poor ground conditions.

 

Find out more about the Alumina refinery cooling tower project:
pdf Gove_Refinery (133.06 Kb)

Begawan Giri Resort

Location: Begawan Giri, Bali, Indonesia

  • Boutique villa resort in the mountains of Bali
  • Infrastructure master planning with total engineering design including civil, structural and building services from concept to building supervision using on-site superintendant.
  • Development of in-ground portal systems to resist earthquakes on 30 degree unstable slopes.

Sunrise@1770

Client: MiDell DEvelopments Pty Ltd
Project Architect: Gabriel and Elizabeth Poole Design Company
Project Manager: Halliburton KBR
Location: Agnes Water, Queensland

  • Finalist, Sustainability in Built Environment, EPA Sustainable Industries Awards 2006
  • Bligh Tanner was the structural engineer and was responsible for the Springs Club and Beach Club facilities and amenity buildings.
  • Minimal clearing and minimal flora disturbance was achieved through low impact road layouts and building methods.
  • Awnings, breezeways, glass roofs and innovative water features that combine to cool the community areas naturally are part of the efficient design and materials selection.

 

Find out more about Sunrise@1770:
pdf Sunrise@1770 (181.22 Kb)
 